30
edits
No edit summary |
No edit summary |
||
| Line 9: | Line 9: | ||
== '''Current State of Project''' == | == '''Current State of Project''' == | ||
<del>Proposal</del> | <del>Proposal</del>. ACCEPTED! | ||
<del>Planning</del> Mostly complete. | |||
Material Acquisition | '''Material Acquisition''' In progress. We have bought an initial batch of 3 2x12x98 (on 12/09/25) for testing purposes. If all goes well we will buy the remainder, however we will likely continue to do this in batches. | ||
Material Prep | '''Material Prep''' In progress. | ||
Assembly | Assembly | ||
| Line 30: | Line 30: | ||
* | * | ||
* Determine date for milling of material (will require a group of volunteers) | * Determine date for milling of material (will require a group of volunteers) | ||
== '''Volunteer Workdays''' == | |||
''Past Workdays'' | |||
* 1/10/26 - Aimed to test our process for dimensioning the raw lumber into square usable boards. After minimal experimentation it was clear that using a pretty standard approach of facing a board on the jointer, then thickness planing on the planer is going to work for us. after that, using the faced surface as a reference, we could joint another side of the board to a square corner. finally we ripped the board to the correct width using this edge against the fence. we ended up with a 1.25"x 4.5" x 96" board that was very (if not perfectly) square. definitely looked good enough for a glue up. | |||
== '''Volunteers for workdays''' == | == '''Volunteers for workdays''' == | ||
| Line 37: | Line 44: | ||
== '''Reference Material''' == | == '''Reference Material''' == | ||
Need to confirm that uploading the free version of the Anarchist Workbench pdf meet that hacksburg wiki guidelines | Need to confirm that uploading the free version of the Anarchist Workbench pdf meet that hacksburg wiki guidelines, in the meantime here is a [https://blog.lostartpress.com/wp-content/uploads/2020/07/AWB_Consumer_June-2020_v5.pdf link] | ||
edits