Woodworking Bench: Difference between revisions

no edit summary
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
== '''Project Summary''' ==
== '''Project Summary''' ==


We are building a strong, stable bench to replace the "door bench" currently being used in the work shop.  While we are going to be using designs for "woodworking" bench, our bench will be usable for all project types.  We are going to use the designs and concepts defined in the [https://blog.lostartpress.com/2020/07/06/now-available-for-free-the-anarchists-workbench/ Anarchist Workbench].  This bench will be built from construction lumber (2xX), which we will mill to more exact dimensions), to form a large, think, glue-up table top and mortise and tenon joinery for the legs and stringers.  Instead of glued or dry fitted joins we will use drawboring to secure our joints.  This page will be used to track our plans and progress and manage communication as the project evolves.
We are building a strong, stable bench to replace the "door bench" currently being used in the work shop.  While we are going to be using designs for "woodworking" bench, our bench will be usable for all project types.  We are going to use the designs and concepts defined in the [https://blog.lostartpress.com/2020/07/06/now-available-for-free-the-anarchists-workbench/ Anarchist Workbench] ([https://blog.lostartpress.com/wp-content/uploads/2020/07/AWB_Consumer_June-2020_v5.pdf pdf]).  This bench will be built from construction lumber (2xX), which we will mill to more exact dimensions), to form a large, think, glue-up table top and mortise and tenon joinery for the legs and stringers.  Instead of glued or dry fitted joins we will use drawboring to secure our joints.  This page will be used to track our plans and progress and manage communication as the project evolves.


Zulip Chat, where most planning and discussion happens: [https://chat.hacksburg.org/#narrow/channel/26-Group-Projects/topic/Woodworking.20Bench.20Project Chat]  
Zulip Chat, where most planning and discussion happens: [https://chat.hacksburg.org/#narrow/channel/26-Group-Projects/topic/Woodworking.20Bench.20Project Chat]  
Line 18: Line 18:
'''Material Prep''' In progress.
'''Material Prep''' In progress.


Assembly
'''Assembly''' In progress


== '''Action Items''' ==
== '''Action Items''' ==


* Finalize initial material purchase requirements  
* Finalize initial material purchase requirements COMPLETE!
Currently projecting 8 2x12x96 for base and 9 2x12x96 for table top.  Propose we round to 20 and add 10% for errors and bad board, bringing us to:
Currently projecting 8 2x12x96 for base and 9 2x12x96 for table top.  Propose we round to 20 and add 10% for errors and bad board, bringing us to:


22 2x12x96 southern yellow pine.  we should look for select structural (SS) grade, or failing that No.1 grade boards.  they will be a little more expensive but fewer knots and chatter (hopefully)  
22 2x12x96 southern yellow pine.  we should look for select structural (SS) grade, or failing that No.1 grade boards.  they will be a little more expensive but fewer knots and chatter (hopefully)  
* Purchase initial materials (2xX stock)
* Purchase initial materials (2xX stock) COMPLETE!
*  
*  
* Store material to get to appropriate moisture content
* Store material to get to appropriate moisture content IN PROGRESS!
*  
*  
* Determine date for milling of material (will require a group of volunteers)
* Determine date for milling of material (will require a group of volunteers) IN PROGRESS!
We have milled all the worktop material
We still need to mill the material for the base
 
* Glue up top COMPLETE!
 
* Glue up base components
 
* Assemble base components
 
* Cut mortises for base
 
* Assemble and draw bore
 
* Add leg vise
 
* Drill dog holes
 
* Finish work surface
 
 


== '''Volunteer Workdays''' ==
== '''Volunteer Workdays''' ==
37

edits